Altamont CUSD #10

Scope Phase 1:

Contract: $3,224,500

Annual Energy Savings: $10,642

Annual Operational Savings: $160,000

This project was a complete renovation of the grade school. GRP replaced old, inefficient leaking windows with new windows. An electrical upgrade was performed along with new control valves, new HVAC upgrade, new lighting and ceilings. Air conditioning was installed throughout entirety of building. A new restroom addition occurred along with renovation of existing restrooms. Installation of new playground and drainage system around the entire school. The second phase included a new elementary playground and 20-year HLS work at High School.

Read Full Case Study