Abengoa Plant Arizona

600 Tons of Pipe Fabrication for Abengoa Plant in Arizona

GRP fabricated 600 tons of piping in five months for a new solar/power plan in Arizona in the summer of 2012.  GRP competed against non-union companies for the project.  Crucial pipe fabrication production expectations of 700 weld inches per day.  Welds ranged from 2” standard wall pipe to 48” extra heavy wall pipe to schedule 120 pipe nearly 2” thick.

$6.6 Million

Read Full Case Study

Before

After